Description
ZB200 Bailey Bridge
----Specification
* Standard : ASTM, GB,BS
* Material : S355JR,S450J0, Gr65,GR50
* Panel Size : 3048mm*2134mm*176mm * Type : Heavy
* Application Scope : Road Construction ; Railway Construction ; Emergency Usage ; Military Usage :
Introduction: ZB200 Bailey Bridgeis a standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges , Emergency Bridges and Fixed Bridges. The bridge has the advantages of few components, light weight and low cost. Bailey bridge is similarly like Mabet compact 200 ,Acrow bridge International bridge. it is assembled by each 3.048m panel. The Zb200 panel bridge can be easily dissembled and rapidly erected. The whole bridge is made by high-tensile strength steel. Main beam is light weight panels and the panels are connected by panel connection pins. It is easy to assemble or disassemble and transport. It can also be assembled into different forms of panel bridges according to their span length and transportation requirement. So, it has been widely applied as emergency transportation, temporary or permanent bridge. Its suitable load design is such like HS-15, HS-20, HS-25,HL-93,HS-30 and pedrail-50 etc.
- Steel bridge
- Bailey Bridge
- Steel Structure
Production Capacity:
Not informed
Delivery Timeframe:
Within 30 Days
Incoterms:
CFR - Cost and Freight
CIF - Cost, Insurance and Freight
CIP - Carriage and Insurance Paid to
DAF - Delivered At Frontier
DDP - Delivered Duty Paid
DDU - Delivered Duty Unpaid
EXW - Ex Works
FOB - Free on Board
Packaging Details:
Not informed
More about
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
50-100
Employees
1M - 2M
Sales volume (USD)
50%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
- Importer / Trading Company
Keywords
- Steel bridge
- Bailey Bridge
- Steel Structure
Contact and location
- Andy xu
- +86 xxxxxxxx
- Zhenjiang / Jiangsu | China